ER INGENIERIE Extraction Skid textile machinery



If you decide to buy equipment at a low price, make sure that you communicate with the real seller. Find out as much information about the owner of the equipment as possible. One way of cheating is to represent yourself as a real company. In case of suspicion, inform us about this for additional control, through the feedback form.
Before you decide to make a purchase, carefully review several sales offers to understand the average cost of your chosen equipment. If the price of the offer you like is much lower than similar offers, think about it. A significant price difference may indicate hidden defects or an attempt by the seller to commit fraudulent acts.
Do not buy products which price is too different from the average price for similar equipment.
Do not give consent to dubious pledges and prepaid goods. In case of doubt, do not be afraid to clarify details, ask for additional photographs and documents for equipment, check the authenticity of documents, ask questions.
The most common type of fraud. Unfair sellers may request a certain amount of advance payment to “book” your right to purchase equipment. Thus, fraudsters can collect a large amount and disappear, no longer get in touch.
- Transfer of prepayment to the card
- Do not make an advance payment without paperwork confirming the process of transferring money, if during the communication the seller is in doubt.
- Transfer to the “Trustee” account
- Such a request should be alarming, most likely you are communicating with a fraudster.
- Transfer to a company account with a similar name
- Be careful, fraudsters may disguise themselves as well-known companies, making minor changes to the name. Do not transfer funds if the company name is in doubt.
- Substitution of own details in the invoice of a real company
- Before making a transfer, make sure that the specified details are correct, and whether they relate to the specified company.
Seller's contacts




















Marke: ER INGENIERIE
Manufacturer
ER INGENIERIE
Type of machine
Extraction skid
Year of manufacture
2020
Condition
The unit has never been used in production
Certification
EC and ATEX
Technical Details
Process: Extraction with supercritical CO2 or subcritical water
Process equipment: CO2 storage tank / Subcooler exchanger / High pressure diaphragm pump /Hot exchanger / 2 Extractors (1L and 10L) / Back pressure regulator / 2 Separators + Co-solvent line
Max. operating pressure: 1 000 bar
Max. operating temperature: 180 °C
Contact material: 316L stainless steel
Capacity: E310 Extractor 1L inside basket
E300 Extractor 10L inside basket
CO2 storage tank
15 L
Separators 2 x 1,2 L
HP pump flowrate: 20 kg/h @ 1 000 bar
Main components
CO2 storage tank
15 L
PS 100 bar
TS -20 / 80 °C: CO2 input (primary storage or recycling)
CO2 output
cold double jacket
level measurement
pressure measurement
temperature measurement
safety valve calibrated at 90 bar
a flange for maintenance
drain valve
Subcooler exchanger: counterflow plate heat exchanger
HP pump: diaphragm metering pump
cooled pump head
variable speed drive and flowmeter for controlling the CO2 flow
pressure switch and safety valve calibrated at 1050 bar
diaphragm rupture indicator
Hot exchanger: shell and tube heat exchanger
E310 Extractor: 1L inside basket
E300 Extractor: 10L inside basket
Extractors
PS 1 100 bar
TS 0 / 200 °C
opening by bolted flange: double jacket with thermal oil
inlet of CO2 at the bottom allowing homogeneous percolation through the feed bed
CO2 outlet under the top cover
extraction basket equipped with two sintered metal discs of suitable porosity
pressure measurement
temperature measurement
safety valve calibrated at 1 050 bar
hoist for loading and unloading the basket
drain valve
Separators
2 x 1,2 L
PS 100 bar
TS 0 / 200 °C: tangential inlet of CO2 / extract mixture from the top
CO2 gas outlet via a central tube from the top of the separator
double jacket with thermal oil
pressure measurement
temperature measurement
safety valve calibrated at 90 bar
opening system by bolted flange
extract collection valve at the bottom of the separator
Back pressure regulator
Co-solvent line
Skid: the process is installed on a framework
and the skid is also equipped with all the required valves and instruments
Automation: control and regulation of CO2 pump for HMI
data recording / display of process parameters in real time / alarm management
valves and temperature regulations are manual
Electricity: Electrical study and skid wiring are already done. From an electricity point of view
it is plug and play
Required services: Electricity
clean and dry compressed air at 7 bar min
liquid CO2 at 50 bar min. to fill the storage tank
Find more here
show contacts
Contact us at
show contacts